Demos

See it working.

Short screen recordings of real 3DEXPERIENCE and CATIA work, in the order a job runs: how the method works, why one governed record matters, then a mass timber job from the client's RFQ email to the install sequence on site, then more CATIA automation. Where a recording became an interactive 3D scene, the link to that scene is on the card.

Part 1 · How it works

Capture the knowledge once, then run it in parallel.

The method in two short videos: why expertise scales when it is captured, and the five steps that turn it into models.

  1. 01 1:32

    Serial vs parallel with AI knowledge capture

    Three engineers each produce one design option, and the best answer depends on who is most senior. Capture their skill, standards and lessons learned in a governed knowledge base, and one engineer explores more options with the same expert accountability. AI does not replace expertise. It scales it.

    See it on How It Works →
  2. 02 2:46

    The five-step workflow, end to end

    The five steps running in 3DEXPERIENCE: reference projects collected in the community wiki, the spec sheet and column grid, documents tracked through document management, and the generated CATIA model reviewed in 3D and linked back from the project page.

    See the five steps on How It Works →
Part 2 · Why it matters

One governed record instead of files between tools.

Start here: what changes for the business when every role reads and writes the same record.

  1. 03 1:32

    Optimize your business with BIM and PLM

    BIM and LOD define the building; PLM controls its revisions, approvals and history. Connect the two and the scope is agreed, the right revision is released to the machine, and every element is traceable to where it is.

    Explore the 3D storyboard →
  2. 04 4:18

    Many files or one record?

    Same roles, same workflow, same connector change at two firms. One passes files between tools and has to ask which plate the shop is cutting. The other changes one parameter on one record, and the analysis, release and shop data follow.

    Explore the 3D scene →
Part 3 · One job, end to end

A mass timber job from the RFQ email to the install sequence.

Each recording is one step of the 3D storyboard, in the order the work happens.

  1. 05 0:45

    The RFQ arrives

    The client emails the RFQ through Outlook. The attachments are saved straight into 3DEXPERIENCE document management, with revisions and maturity, and that save starts the digital thread.

    In the storyboard: step 1 →
  2. 06 2:16

    Review the RFQ, write the RFI

    The RFQ data is ingested and registered in the project, the review is scheduled, and the team works through it on a call and a whiteboard. The issues become the RFI and feed the project schedule.

    In the storyboard: step 2 →
  3. 07 1:11

    AI project management

    The project plan in 3DPlan: phases, gate milestones, tasks with dates and assignees, living next to the documents and models they refer to instead of in a separate scheduling tool.

    In the storyboard: step 4 →
  4. 08 2:15

    Spec to CATIA model, end to end

    Lock the spec sheet and upload it. An AI agent sees the maturity change, drives a CATIA session that generates the building structure, and the result is published for review in the web viewer.

    In the storyboard: step 6 →
  5. 09 0:34

    The model and its connectors

    Columns, beams and CLT with their MEGANT connectors, detailed in CATIA and reviewed in 3DPlay. This released model is what the staging yard, the CNC line and the erection scenes are built from.

    In the storyboard: step 6 → Staging yard → CNC & pre-assembly →
  6. 10 0:27

    The install sequence

    Anchors, columns, beams and CLT set floor by floor in the order the model defines. On site, the crew scans each piece's QR and the phone checks it against this same sequence before it goes on the hook.

    In the storyboard: step 11 → Erection scene →
Part 4 · More CATIA automation

From someone else's model to IFC and drawings.

The same knowledge-driven approach applied to a residential apartment unit.

  1. 11 2:53

    Rhino STEP to IFC

    A STEP export from Rhino comes into 3DEXPERIENCE as plain geometry. A knowledge rule turns it into a building, storey, slab, columns, walls and beams, which export as IFC and open correctly in an IFC viewer.

  2. 12 1:35

    Beams, rebar and drawings, generated

    Knowledge patterns place the beams and their reinforcement cages from the apartment model, then produce the beam schedule table and the rebar detail drawings from the same data.

Interactive 3D

Explore the scenes the recordings came from.

Each scene runs in the browser. Inside every scene there is a Watch button for its recording.

Want to see this on your own data?

Start with one project.

Send one current or recent project: the RFQ, the plan in whatever form it exists, and one work package's model. I will tell you plainly which of these steps is the strongest candidate for a fixed-scope proof of concept.