Jeffrey Roark · PLM consultant for mass timber and offsite manufacturers · myaimfg.com

Keep the margin you won at the bid

Drag to orbit · right-drag to pan · scroll to zoom · click a screen to enlarge
Building the scene
Behind the demo: what the scene is built from, and what is not real yet

What the scene is built from

Building
RFQ-001_6x3_MassTimber_LOD200 P01 (5 Oct 2026) and P02 (6 Oct 2026), IFC4. A 6 × 3 bay glulam frame with CLT floors, 36.0 × 22.5 m, roof at +15.000.
Elements
P01: 441 · P02: 581
Rev B
140 new connectors, 186 reshaped elements
Factory
0001 Demo Mass Timber A.stp, AP242: Mass Timber Group Factory with Gross Material Area, NC Machine00001023, Pre-Assembly WorkCenter, Transport, Work Package Staging Area and Erection Area.
Work package 1
Gross Column 4000x360x360_1 with CON - Concrete to Column Stack 175 (8 parts) and CON Column to Column Knife (42 parts).
Updated STEP
0001 Demo Mass Timber A_(1).stp (17 Oct 2026) adds the client project with both IFC revisions and the connector assemblies in the building frame: the concrete-to-column stack on 4 M24 anchors and the column-to-column knife at grid D/7, a core-to-beam knife plate, a core-to-CLT ledger, a diaphragm angle and an LVL spline. They replace the IFC parts at the same spots: CB00-D7, CS01-D7, BK01-1B, CP01-1B and LG01-2BC-1/-2. It also adds a CLT Work Package on the NC machine and three transport work packages on five trucks in the staging area.
Transport
Work package 1: 32 pre-assembled columns. Work packages 2 and 3: 25 and 26 CLT slabs. Two trucks are still empty.
Truck
MB-Actros-3a_Standard A.stp, tessellated with OpenCascade: the tractor and the trailer chassis as modelled. The flatbed deck on the trailer is added: 16 hardwood planks and steel edge rails, 2.48 × 12.2 m, deck top at +1.421.
Screens
16 screenshots from the tenant: Plan Explorer, the dashboards, Tasks, 3DWhiteboard, 3DSwym and the myCompany Utility.
QR codes
One QR label per element, here the work package 1 column, from CNC machining through pre-assembly, transport and staging to the installed frame. All of them point to one record, which is the single source of truth. The code content is a placeholder I chose, not a real 3DEXPERIENCE link.
People
Rigged avatars from the Site A scenes. Chuck, Jeffrey and Joe are styled from their headshots; the client, owner, CNC operator, shop, driver and crew each have their own look.

Not in this version yet

  • Steps 01, 02, 04, 05 and 06 show drawn stand-ins (the emails, the RFI, the document list) until there are screenshots. The RFI questions after RFI-001 and the revision P02 file list are my wording.
  • Avatar likeness: the client, owner and CNC operator have no photos yet, so their faces are generic.
  • The working screens (Chuck's laptop, the owner's and Jeffrey's and Joe's monitors) are drawn in the page from your tenant's tasks, dates and models, with 3D views of the real IFC and STEP geometry. They are not live 3DEXPERIENCE sessions. Joe's task (C.14 DFMA review) and its link to the base connector are my choice.
  • Videos: none yet. Any scene can take a video screen.
  • The assumptions (CATIA automation of design, drawings and BTLx; AI-driven workflow) are stated in the story, not demonstrated in it. The CNC scene says the BTLx comes from CATIA, but there is no BTLx file behind it. The tenant's plan phases A to F are kept in each step's caption.
  • Work packages 2 to 4 are empty in the STEP. On site, the IFC storeys stand in for them: a storey's columns go with the floor above. The IFC gives every element the package number RFQ-001.
  • Loads on the flatbed: the model rests them on the bare trailer frame. Here they keep their places on the trailer, raised 140 mm onto the added deck and dunnage. Two trucks in the model sit 160 mm above the ground; here they stand on it.
  • The column at D/7 runs 3900 between its connectors, matching the IFC column C00-D7; the gross column it is cut from is 4000. Its QR keeps the same placeholder code.
  • Gross Beam 7040x720x280 measures 7140 long in the STEP geometry.
  • Factory layout: every STEP area sits at the model origin, so the stations are placed by hand.
  • STEP attributes: none came through the export, only names and descriptions.